After completing the preliminary inspection work, you can start to pave the floor. Let's take the laying methods of solid wood flooring and solid wood composite flooring as examples to introduce the steps of floor paving.

1. Ground finishing: clean up the building residues on the ground, preset the height of the door to be less than 10%;

2. Open skirting holes: the hole distance is 500mm±10mm, and the hole diameter should be 3-5mm<10% smaller than the diameter of the wooden wedge;

3. Thoroughly clean the floor hygiene: do not underestimate this problem, the cleanliness of the floor is very important;

4. Laying moisture-proof film: Laying a 0.2mm-thick moisture-proof film; overlap the joints by 200mm, and seal them tightly with tape. The wall should be lifted by 50-60mm;

5. Laying floor mats: The floor mats cannot be overlapped, and the joints should be sealed with 60mm wide tape, and the surrounding sides should be 30-50mm above the skirting line;

6. Pre-select color separation and test paving: there is a color difference problem, and color distinction needs to be carried out, and communication and paving consensus must be reached before paving;

7. The pavement room starts from the upper left corner: the mother tenon of the floor is leaning against the wall, and 8-12mm reserved seams should be reserved for fixing objects such as walls and water pipes, and they are positioned with wedges;

8. Floor splicing by hammer hitting: In the process of splicing the floor, you need to hit the floor splicing with a hammer;

9. Installing springs at the end: After paving the floor, take out the positioning wedges and install springs on the ends or edges of the floor;

10. Install the skirting line: After the nail is driven into the skirting line, completely smash the nail cap in, and apply nail eye ointment of similar color;

11. Clean and hygienic: Clean the floor hygienic and reach the standard for direct living.