Floor Decoration Essentials
Jan 07, 2020
Leave a message
Whether the floor is good or not, three points depend on quality and seven points depend on paving. After choosing the floor, the installation is next. The quality of the paving plays an extremely important role in the subsequent use of the floor. If the paving environment is not comprehensively inspected before paving, various quality problems will easily occur after the floor has been used for a period of time. The so-called haste is not enough, let us first fully understand which environmental conditions can meet the requirements of laying floors.
1. Ground moisture content: the required standard for ordinary ground is <20%, and the required standard for geothermal floors is <10%;
2. Ground flatness: If it is not level, it needs to be flattened with a spatula, if it is serious, it needs to be leveled again or self-leveling;
3. Whether the ground is solid: hit the ground with a screwdriver handle or a hammer to check whether the ground is hollow or peeling;
4. Whether there are termites in the environment: carefully observe whether there are termites around the room and furniture, and perform inspection and prevention projects;
5. Avoid cross-mixing operations: Floor paving should be carried out after the completion and acceptance of ground concealed works, ceiling works, etc.;
6. Whether waterproof measures are taken: Check whether the waterproof measures are well done before paving and whether there is water leakage in the house;
7. Concealed engineering consultation and labeling: mark the location of the concealed engineering in the room and highlight it to avoid damage during construction.
